CTE LITORAL 2

Almeria (Spagna)

CLIENT:
Alstom Italia / ENEL

YEAR & AIM OF THE PROJECT:
2014-2016 | INDUSTRIAL-POWER

AIM OF THE PROJECT:
Revamping absorber.

BY SCL:
In the context of the improvement project of the Litoral Power Station di Endesa Educa in Carbonera , Alstom Italia has commissioned to SCL the structural checks of the existing absorber to assess the stability with new technological systems considering new working conditions.