LOCATION :
near Atlanta – GA (USA)
CLIENT :
E80-Group – Italia
PROJECT OVERVIEW :
State-of-the-art double-deep, self-supporting automated warehouse featuring 13 storage levels, 42 bays and 6 stacker cranes. It was delivered as part of the development of a new beverage production facility in Denver, ensuring high storage density, operational efficiency, and scalability.
YEAR & SECTOR :
2022 – 2024 | LOGISTIC – INDUSTRIAL
LOGISTIC & AUTOMATIC PROJECT :
E80-Group
SIZE :
WxDxH : 45.2 x 116 x 31.26+2 m
5.250 mq / 169.000 mc
SCL SCOPE OF WORK :
- SCL provided the detailed executive and construction design of the steel structure, developed using mainly cold-formed profiles and, to a limited extent, hot-rolled sections manufactured in Europe.
- The crane‑rack warehouse is fully automated, ensuring maximum reliability and operational performance.
- The structural system was engineered in full compliance with ASCE 7-16, ANSI MH16.1 (2019), AISI S-100 (2016), AISC 360-16 and AISC 341-16.
- In addition, SCL designed the erection methodology in close collaboration with the installation contractor and worked alongside E80 Group to support on-site construction supervision throughout the project execution.