LOCATION :
Ohio (USA)
CLIENT :
Elettric80 – Italia
LOGISTIC & AUTOMATION PROJECT :
Elettric80
YEAR & AREA OF COMPETENCE :
2017 – 2018 | LOGISTIC – INDUSTRIAL
AREA / VOLUME :
19.500 Sq.m / 486.000 Cu.m
AIM OF THE PROJECT :
The mew rack clad building is part of the new factory built by Sofidel America in Circleville for the production of tissue paper.
The building is 36 meters tall and contains about 57800 pallets on 7 levels.
BY SCL :
Design of all the structural works related to the “Shell & Core”.
The warehouse “smartstore” type is completely automated; the steel structure of the rack is manufactured using cold formed profiles, while the in/out modules are in hot rolled profiles.
The design of the steel structure and of the shell has been carried out according to the US Norms and the Ohio building Code.
All the materials have been manufactured in Europe.